- Why Organizations Must Migrate From Kronos Workforce Central
- Migration Options and Timeline
- What Migrates, What Requires Reconfiguration, and What to Archive
- How to Migrate From Kronos Workforce Central to UKG Pro WFM
- Common Migration Pitfalls
- Migration Partners and Implementation Support
- Frequently Asked Questions
Kronos Workforce Central is an on-premises workforce management system that handles time tracking, scheduling, accruals, and labor analytics for enterprise organizations. With standard support ending March 31, 2027, organizations should plan their transition to UKG Pro Workforce Management (formerly UKG Dimensions), evaluate alternative platforms or discuss limited support extensions with UKG.
This guide explains why organizations are moving, what the migration involves, what data transfers and what must be rebuilt, and which partners can support the transition.
Why Organizations Must Migrate From Kronos Workforce Central
UKG has established a phased end-of-life schedule for Workforce Central deployments. Organizations face different deadlines depending on their deployment model:
|
Deployment Type |
Support End Date |
Status |
|
Kronos Private Cloud |
Ended |
|
|
On-Premises (Engineering) |
Ended |
|
|
On-Premises (Support) |
Active |
The Private Cloud retirement and end-of-engineering deadlines have already passed. However, eligible on-premises customers may continue receiving certain security patches and technical support until the end-of-life deadline. Organizations still using on-premises deployments should target migration before March 31, 2027. Customers with signed UKG contract extensions may receive limited support for the core Workforce Central product beyond this date, subject to service release requirements and contractual terms.
Beyond the support deadlines, several operational factors drive migration decisions:
-
Security exposure: Unpatched systems handling employee PII and biometric data create compliance and audit risks
-
Legislative changes: New state-level requirements for predictive scheduling, meal break penalties, and overtime calculations require system updates that unsupported platforms cannot receive
-
Integration degradation: Connected payroll, HRIS, and ERP systems continue to update while Workforce Central remains static, causing gradual integration failures
The critical consideration for HR, payroll, and IT leaders: moving to UKG Pro WFM involves a platform reimplementation rather than a conventional upgrade. Although migration tools can help transfer existing configurations, organizations must review, adapt, and validate pay rules, integrations, and business structures against the new platform. This makes the transition effectively a net-new implementation regardless of whether you stay with UKG.
Migration Options and Timeline
Organizations have several paths forward, each with different implications for timeline and investment.
Option 1: Migrate to UKG Pro WFM
UKG's designated successor platform. This keeps organizations within the UKG ecosystem and provides a defined migration path, though existing configurations must be assessed, migrated or reconfigured, and validated.
Option 2: Evaluate Alternative WFM Platforms
Since migration to UKG Pro WFM involves a platform reimplementation, some organizations use this transition to evaluate alternatives such as Workday Time Tracking, Dayforce, or ADP Workforce Now. Implementation requirements vary by platform, existing configurations, workforce complexity, and integration needs.
Option 3: Remain on Workforce Central Temporarily
Eligible organizations may arrange limited support extensions directly with UKG. These extensions cover specified core Workforce Central modules but exclude routine maintenance, enhancements, upgrades and security services. Organizations remaining on the platform without an extension should assess contractual restrictions, security exposure and ongoing compliance risks.
Timeline Planning Considerations
For organizations targeting UKG Pro WFM, timeline depends on several factors:
-
Employee count: Larger employee populations can extend data migration, configuration, testing, and deployment timelines
-
Union contracts: Complex collective bargaining agreements with seniority rules, shift differentials, and retroactive pay adjustments extend the pay rules configuration phase
-
Integration complexity: Organizations with custom WIM rules face the longest rebuild effort
-
Blackout periods: Year-end, open enrollment, and holiday periods create scheduling constraints
Organizations with March 2027 deadlines should begin partner selection and project planning immediately if they haven't already.
What Migrates, What Requires Reconfiguration, and What to Archive
Understanding what transfers cleanly versus what requires rebuilding is essential for realistic project planning.
What Can Be Migrated
-
Active employee records: Current employees with demographic data, job assignments, and organizational hierarchy
-
Current accrual balances: PTO, sick time, and other accrual balances (validate per employee during migration)
-
Open schedules: Future-dated shifts and scheduling templates
What Requires Reconfiguration
-
Pay rules: Existing pay rules must be reviewed and validated in UKG Pro WFM. Shift differentials, overtime calculations, premium pay rules, and meal break penalties may require reconfiguration, while legacy Workforce Integration Manager (WIM) interfaces require separate integration assessment.
-
Integrations: WIM-based integrations to payroll, HRIS, and ERP systems must be assessed and adapted using UKG Pro Integration Hub, supported APIs, or file-based integration methods.
-
Custom reports: Legacy Genies and custom SQL-based reports must be reviewed and adapted for UKG Pro WFM. Reporting requirements can be addressed using Dataviews, HyperFind queries, built-in reports, or external BI tools.
-
Time clock hardware: Legacy Kronos 4500 terminals may require replacement. Organizations should confirm model compatibility, firmware requirements and connectivity configurations with UKG before finalizing hardware migration plans.
What Should Be Archived
-
Historical timecards: Retain historical timecards in an accessible archive. Confirm which active records and operational data are supported by the new platform's migration tools.
-
Closed pay periods: Historical payroll data should be retained in queryable archive format, not migrated into the new system
-
Former employee records: Archive rather than migrate to avoid inflating implementation scope
The historical data archival decision affects both project scope and ongoing compliance. Under the FLSA recordkeeping requirements, employers must retain payroll records for at least three years and wage calculation records, including timecards, for at least two years. Additional state-specific retention requirements may apply. Plan your archival strategy early to ensure audit trails remain accessible after Workforce Central is decommissioned.
How to Migrate From Kronos Workforce Central to UKG Pro WFM
Step 1: Assess the Existing Environment
Form a steering committee and assign a dedicated WFM Program Leader with decision authority. Inventory all current configurations:
-
Pay rules, work rules, and accrual policies
-
Active integrations (payroll, HRIS, ERP, time clocks)
-
Custom reports and data exports
-
Collective bargaining agreements (if unionized)
-
Time clock hardware counts and locations
Document which Workforce Central deployment you have and identify any blackout periods that constrain cutover timing.
Step 2: Select Migration Approach and Partner
Choose between two primary approaches:
-
Lift and Shift: Minimize changes during migration, replicate existing configurations as closely as possible in the new platform
-
Optimize: Use the transition to redesign processes, eliminate outdated rules, and implement new capabilities
Select a UKG implementation partner with demonstrated experience in your industry and complexity level. Ask specifically about their pay rules engineering expertise and request references from similar organizations.
Step 3: Configure Pay Rules and Integrations
This can be one of the most time-intensive phases, particularly for organizations with complex pay rules and collective bargaining agreements. Map every Workforce Central pay rule to its UKG Pro WFM equivalent. Document shift differentials, overtime calculations, premium pay, and meal break penalties.
Simultaneously, adapt existing integrations using UKG Pro Integration Hub or other supported integration methods. Review integration timing, data formats, error handling, and correction windows to maintain consistency across connected systems.
Step 4: Perform Test Loads and Validation
Extract active employee data from Workforce Central. Cleanse and transform to match UKG Pro WFM's data model. Load employees, jobs, supervisors, locations, and labor attributes.
Migrate current accrual balances and validate per employee. Reconcile employee counts, accrual totals, and organizational hierarchy. Document and resolve any discrepancies before proceeding.
Step 5: Complete Parallel Payroll Testing
This phase is non-negotiable for payroll accuracy. Run multiple full pay cycles in parallel using both systems to validate payroll accuracy. Compare results at the employee and pay-code level, not just totals.
Include at least one irregular cycle (holiday, bonus, correction) in parallel testing. Investigate every variance, including one-cent differences. Small rule discrepancies compound across employee populations.
Step 6: Plan Cutover and Go-Live
Execute final data load during a maintenance window. Cut over at an accrual period boundary if possible to avoid balance mismatches. Deactivate Workforce Central (read-only mode) and activate UKG Pro WFM.
Monitor the first punches, approvals, and exceptions intensively. Hold daily stand-ups for the first week. Have a rollback plan documented in case of critical failures.
Step 7: Provide Post-Go-Live Support
Maintain elevated support for 90 days post-go-live. Monitor exceptions and issues daily. Tune configurations based on production use. Address payroll discrepancies immediately.
Conduct a post-implementation review and transition to steady-state support (internal team or managed services agreement).
Common Migration Pitfalls
Pay rule discrepancies after go-live can occur when legacy Workforce Central pay rules are not correctly mapped or validated against UKG Pro WFM configurations. Assumptions made during configuration create calculation differences that only surface in production. The solution is thorough parallel payroll testing, comparing results for each employee at the pay-code level across multiple cycles.
Accrual balance mismatches result from mid-period cutovers combined with tenure-based tier changes and carryover logic differences between platforms. Plan cutover at accrual period boundaries and recompute balances per employee against the new system's rules.
Integration timing failures can occur when legacy batch processes are replaced with new scheduled, file-based, or API-driven integrations. If payroll file timing is off, hours can be dropped or duplicated. Document file timing, error handling, and correction windows. Test with actual payroll cycles, not just sample data.
Historical data scope inflation occurs when teams default to "migrate everything" without a retention plan. This bloats project scope and extends timelines. Define retention requirements early and archive historical data separately rather than migrating years of history into the new system.
Terminal hardware delays can occur when organizations assess hardware compatibility or order necessary replacements too late in the project. Procurement, staging, and installation have lead time. Order hardware early and plan staged rollout by site if necessary.
Experienced implementation partners have methodologies to address these challenges through proper discovery, testing protocols, and cutover planning. For organizations managing complex data conversion requirements, implementation teams can use Integrate.io to build reusable data mapping, transformation, and validation pipelines. These workflows can be adapted for subsequent client implementations, reducing repetitive development and manual reconciliation between test loads.
Migration Partners and Implementation Support
Several implementation partners have documented experience with Workforce Central to UKG Pro WFM migrations:
Improvizations (Improv) provides client-side UKG migration support, including configuration assessments, business structure workshops, project management and application consulting.
Healthcare IT Leaders supports healthcare organizations transitioning from Workforce Central to UKG Pro WFM, with expertise in workforce management, scheduling, implementation, and user adoption.
RSM US provides UKG workforce management consulting and implementation services, helping organizations transition from Workforce Central while assessing workforce policies, processes, and technology requirements.
Cognizant provides UKG workforce management implementation, integration, migration, and support services through its global delivery network.
Accenture supports UKG Pro WFM implementations and Workforce Central migrations, including complex integrations, change management, and global workforce transformations.
When evaluating partners, ask specifically: How many union contracts has your team configured in UKG in the last 24 months? Who will be the pay rules engineer on our project? Can you provide references from clients with similar complexity who went live without payroll corrections in the first 90 days?
For a broader overview of implementation specialists and their services, explore our guide to UKG implementation partners. You can also verify official partner classifications through the UKG Marketplace.
Frequently Asked Questions
When does Kronos Workforce Central support end?
Standard on-premises support ends on March 31, 2027. Kronos Private Cloud and full on-premises engineering support ended on December 31, 2025. Limited support beyond March 2027 may be available through signed contract extensions with UKG, subject to specific eligibility requirements.
Is migrating to UKG Pro WFM an upgrade or a reimplementation?
It is a reimplementation rather than a conventional upgrade. UKG provides tools to help migrate existing configurations, but pay rules, integrations, and reports must be reviewed, adapted, and tested for compatibility with the new platform.
How long does the migration take?
Implementation timelines vary considerably depending on project scope. Environments with minimal customization generally require less implementation time, while complex union contracts, extensive integrations, and large employee populations can extend configuration and testing timelines.
What happens to historical data during migration?
Historical timecards and schedules should generally be archived separately. Migrate supported operational data, such as active employee records and current accrual balances. Use archival solutions to retain historical workforce and payroll records for compliance while keeping them accessible for audits.
Do we need to replace our time clocks?
Not necessarily. UKG Pro WFM supports compatible InTouch 9000, 9100 and InTouch DX terminals, subject to applicable firmware requirements. Organizations using legacy Kronos 4500 terminals should confirm compatibility directly with UKG before deciding whether replacements are necessary.
Can we stay on Workforce Central after support ends?
Organizations should confirm their contractual rights and support eligibility with UKG before remaining on Workforce Central after its end-of-life date. Limited contractual support extensions may provide additional transition time, but they do not restore full engineering or maintenance services. Delaying migration can increase security, compliance and operational risks.
Integrate.io is a fixed-fee data pipeline platform for ETL, ELT, CDC and Reverse ETL. Anyone on your team can build pipelines using low-code drag-and-drop or AI agents, with a dedicated Solution Engineer every step of the way.